An EV charger can be retrofitted into any existing electrical system with a qualified contractor.
Brite Electric
$500-700 for residential, $12,000-45,000 for commercial
Chargepoint –CT4021 Dual Pedestal
Other suppliers: Blink
Electrify America (businesses only)
See the Virginia guide to electric vehicle tax credits and incentives.
A permit is required in the city of Norfolk if the EV charger will be placed in the right of way. See more information, including a map of EV chargers managed by the City of Norfolk.
Explore more of the Ryan Lab’s Green Systems and take the first step towards a greener future!
Thank you for your interest in the Elizabeth River Project’s River Academy Lecture Hall. We’re delighted that our site is in high demand. As the River Academy Lecture Hall is operated by a small non-profit with a big environmental mission, please help us make sure your event is a great fit.
Please fill this form out at least 30 days in advance of the event.
NOTE: This form does not confirm your reservation, reservations are confirmed upon ERP receipt of signed contract and paid deposit.
Thank you for your interest in the Elizabeth River Project’s Ryan Resilience Lab. We’re delighted that our site is in high demand. As the Ryan Resilience Lab is operated by a small non-profit with a big environmental mission, please help us make sure your event is a great fit.
Please fill this form out at least 30 days in advance of the event.
NOTE: This form does not confirm your reservation, reservations are confirmed upon ERP receipt of signed contract and paid deposit.